Skip to content
CHENGSHUOPRECISION
EN
Request a drawing review

Milled components / cs-product-020

Aluminum positioning frame

An aluminum positioning frame with an open centre and internal features. Define the assembly references, mating clearances and finish requirements.

Material shown
Aluminum
Process reference
Die casting and CNC machining
Manufacturing model
Custom, made to drawing
Dimensions & tolerances
Defined by your approved drawing

Key geometry & review priorities

  • Open rectangular frame
  • Internal locating features
  • Machined mating forms

Reference example, not a stocked standard part. Quote and feasibility require your specification.

Download review brief

THE PRODUCT CASE / YOUR BUYING DECISION

How will the frame be located and supported when opposite-side interfaces are machined and measured?

An open positioning frame must relate features across more than one side of the component. This aluminum die-casting and CNC-machining reference focuses on locating surfaces, support during inspection and the information needed to transfer agreed interfaces into repeat orders.

Explore this product case

BEFORE YOU RELEASE THE DRAWING

A practical next step.

Use these guides to define the records and checks your component needs.

THE FEATURES TO LOOK AT

A closer look
at this component.

An aluminum positioning frame with an open centre and internal features. Define the assembly references, mating clearances and finish requirements.

Original Chengshuo product reference
01

Open rectangular frame

02

Internal locating features

03

Machined mating forms

DEFINE YOUR PART

What needs to
be in your drawing?

Reference images explain geometry. Your approved drawing and agreed inspection records establish dimensions, material and acceptance requirements.

  • Pocket geometry and internal corner radii
  • Hole positions and functional datums
  • Clamping surfaces, edge breaks and finish
  • Drawing number, revision, units and material grade.
  • Surface treatment, sample quantity and repeat-order needs.
Use the complete RFQ checklist
01 / REVIEW

Resolve the requirements.

Share your drawing and the features that affect function. Agree material, process scope, inspection and commercial conditions.

02 / SAMPLE

Define what approval means.

Agree the sample quantity and measurements or assembly checks required for acceptance. Record the drawing revision used.

03 / REPEAT

Control the next order.

Retain the approved specification and packaging requirements. Review design, material or finish changes before repeat production.

Read the sample-to-production guide

Questions before
your drawing review.

Can you change the dimensions or material?

This is a custom component example. Submit your required geometry and exact material grade for feasibility review; the reference image is not a fixed catalogue specification.

What quantity and lead time should I plan for?

Include both sample and production quantities plus your target date. The quotation confirms the agreed scope, price and schedule after review.

Can I send confidential drawings?

If your project needs an NDA, contact Alen before uploading confidential files. Website submission itself does not create a confidentiality agreement.

Related geometries.

Explore milled components
Aluminum fixing plate — AI-assisted studio presentation based on the original Chengshuo photographExplore component AI-assisted studio view
cs-product-018

AluminumCNC machining

Aluminum fixing plate

An aluminum fixing plate with an angled form and a central mounting opening. Define the relationship between the mounting faces and the hole centre.

Explore component
Fiber-optic grinding fixture — AI-assisted studio presentation based on the original Chengshuo photographExplore component AI-assisted studio view
cs-product-029

Stainless steelDrawing-led review

Fiber-optic grinding fixture

Stainless steel grinding-fixture forms with repeated holding positions. Discuss the workpiece interfaces, locating scheme and inspection approach for a comparable fixture.

Explore component

FROM EXAMPLE TO YOUR REQUIREMENT

Found something
close to your part?

Send your drawing

Use an example to explain your idea.
Your own drawing defines the final specification.

FROM COMPONENT TO PROJECT

Review the evidence. Define your part.

Start with the component geometry, then check what the drawing, sample and order records need to establish for your own part.

Send the current drawing with quantities and critical requirements. The review is the starting point for agreeing scope, quotation and sample approval.

Request a drawing review

From drawing to project review.

Read the film transcript

Start with your drawing. Define material and finish. Identify critical features. Align samples and production quantities. Request a project review. Illustrative renders and Chengshuo component photography; this is a project overview, not machining footage.

Discuss your drawing

CHENGSHUO / PROCESS FILMS

Process film

Silent process film. Workshop footage is process context; it is not a record for the reference component.

View original